• Construction of the distribution pressure pipeline (DCI) with all necessary civil and mechanical works:
-DN200 in length of 800m;
-Installation of all required fittings and armatures.
• Installation of house connections to the new pipeline.
Investor: „Univerzal Monte“ Herceg Novi, 2006
Total value of project: €116.000