• Construction of ductile pipeline (DCI) in the direction to „Stari Bar“ Tank with all necessary civil and mechanical works:
- DN200 in length of 227m;
- Installation of all required fittings and armatures.
• Construction of pipeline (PEHD PE100 PN10) in Sutomore with all necessary civil and mechanical works:
-Ø160 in length of 2610m;
-Installation of all required fittings and armatures.
• „Kajnak“ Water Spring – supply and installation of electro-magnetic flow meters ABB MagMaster DN400 and DN200.
• „Zaljevo“ Water Spring – supply and installation of electro-magnetic flow meters ABB MagMaster DN300 and DN200.
• Stari Bar – supply and installation of electro-magnetic flow meters ABB MagMaster DN350 and DN300.
Investor: PE „Vodovod i kanalizacija“ Bar, 2006-2007
Total value of project: €380.000