• Construction of main, thrust and distribution pressure pipeline (DCI) with all necessary civil and mechanical works:
-DN400 in length of 2100m;
-DN300 and DN250 in length of 100m;
-Installation of all required fittings and armatures.
• Construction of distribution pipeline (PEHD PE100 PN10) with all necessary civil and mechanical works:
-Ø400 in length of 300m;
-Ø300 in length of 200m;
-Installation of all required fittings and armatures.
• Construction of pump station with all necessary civil, mechanical and electrical works. The following equipment is installed in pump station:
-Four well submersible pumps ITT Vogel Austria, individual flow of 40 l/s;
-Frequency controllers;
-System for automatic dosing of gas chlorine in water;
-System of measurement, regulation and management.
• Laying of optical cable in length of 2100m.
Investor: Agency for Planning and Construction of Kotor, May-August, 2010
Total value of project: €960.000