• Construction of ductile pressure pipeline (DCI) for water network with all necessary civil and mechanical works:
-DN150 in length of 5000m;
-Installation of 50 above-ground hydrants DN80 with the construction and installation of two-wing doors of stainless steel;
-Installation of all required fittings and armatures.
• Installation of measuring and control equipment;
•Construction and installation of all stainless steel doors in the tunnel;
•Construction and installation of a steel structure for toll gates.
Investor: „Indra Sistemas“ S.A. Spain, 2006
Total value of project: €638.000