water supply system

Sozina Tunnel – Construction of Hydrant Network

• Construction of ductile pressure pipeline (DCI) for water network with all necessary civil and mechanical works:


-DN150 in length of 5000m;
-Installation of 50 above-ground hydrants DN80 with the construction and installation of two-wing doors of stainless steel;
-Installation of all required fittings and armatures.

 

• Installation of measuring and control equipment;

 

•Construction and installation of all stainless steel doors in the tunnel;

 

•Construction and installation of a steel structure for toll gates.

 

Investor:  „Indra Sistemas“  S.A. Spain, 2006
Total value of project: €638.000