• Construction of main, thrust and distribution ductile pipeline (DCI) with fittings and armatures and with all necessary civil and mechanical works:
-Meljine, DN80 in length of 62m, DN100 in length of 1634m, DN150 in length of 382m;
-Bajer Settlement - Španjola, DN80 in length of 321m;
-Manastirska Street, DN150 in length of 319m;
-Mojdeški Put Street, DN80 in length of 525m;
-Nikole Ljubibratića Street, DN200 in length of 650m;
-Orjenskog Bataljona Street, DN200 in length of 695m and DN100 in length of 290m;
-Mojdeški Put II Street, DN100 in length of 366m;
-Kumbor, DN150 in length of 1060m;
-Đenovići, DN300 in length of 1055m and DN200 in length of 1055m;
-Bijela 1, DN200 in length of 307m, DN150 in length of 55m and DN80 in length of 70m.
• Construction of distribution pipeline (PEHD PE100 PN10) with fittings and armatures and with all necessary civil and mechanical works:
-Bajer Settlement - Španjola, Ø80 in length of 44m;
-Kumbor, Ø110 in length of 44m;
-Bijela 1, Ø80 in length of 135m.
• Reconstruction of „Opačica“ Pump Station.
Investor: PE „Vodovod i kanalizacija“ Herceg Novi, 2007
Total value of project: €1.654.000