• Construction of main, thrust and distribution ductile pipeline (DCI) with fittings and armatures and with all necessary civil and mechanical works:
-Njegoševa Street, DN200 in length of 875m and reconstruction of house connections;
-Settlement Sutorina 1, DN150 in length of 398m and DN100 in length of 134m;
-Settlement Sutorina 2, DN100 in length of 1103m;
-Prizrenska Street, Igalo, DN100 in length of 259m;
-Settlement Šištet, Igalo, DN100 in length of 494m;
-Skojevska Street, Igalo, DN200 in length of 500m;
-Norveška Street, Igalo, DN150 in length of 211m and DN100 in length of 56m;
-V Crnogorske Brigade Street, Igalo, DN150 in length of 180m and DN50 in length of 123m;
-Save Ilića Street, Igalo, DN200 in length of 809m, DN150 in length of 42m, DN100 in length of 72m and DN80 in length of 33m.
Investor: PE „Vodovod i kanalizacija“ Herceg Novi, 2006
Total value of project: €658.000