• Construction of main and thrust pressure pipeline (DCI) with all necessary civil and mechanical works:
-DN400 in length of 932m;
-DN300 in length of 78m;
-DN250 in length of 78m;
-Installation of all required fittings and armatures.
• Construction of pipeline (PEHD PE100 PN10) for hydrant network with all necessary civil, mechanical and electrical works:
-Ø63 in length of 1600m;
-Installation of 27 wall hydrants DN50;
-Installation of ITT Vogel, Austria overpressure pump with frequency
regulator and control cabinet, with all the necessary automation and
measuring and control equipment.
• Construction of distribution pipeline (PEHD PE100 PN10) with all necessary civil and mechanical works:
-Ø250 in length of 78m;
-Installation of all required fittings and armatures.
• Installation of hydro-mechanical equipment in the tank with the volume of 5000 m3, with all necessary mechanical works:
-Four well submersible pumps ITT Vogel Austria, individual flow of 40 l/s;
-Three well submersible pumps ITT Vogel Austria, individual flow of 30 l/s;
-Installation of all required fittings and armatures.
• Construction of capturing chamber with the volume of 300m3.
Investor: „Rudnici boksita“ Nikšić, 2006
Total value of project: €460.000