water supply system

Relocation of the Pipeline due to Construction of the Splendid Hotel Bečići

• Construction of a section of the main ductile pipelin (DCI) with all necessary civil and mechanical works:
-DN450 in length of 800m;
-Connection to the existing AC pipeline DN450;
-Installation of all required fittings and armatures.

 

Investor:  „Trade Unique“, Budva, 2005
Total value of project: €160.000