water supply system

Water supply system
Reconstruction of Water Supply Network in Bar - Phase II
Water Supply Utility 'Poklonci' Nikšić
Connection of the Water Supply System of Kotor on the Regional…
Sozina Tunnel – Construction of Hydrant Network
Reconstruction of Water Supply Network in Herceg Novi - Phase…
Reconstruction of 'Vrmac' Kotor Tunnel – Hydro-…
Rehabilitation of Water Network in Bar - Phase I
Reconstruction of Water Network in Herceg Novi – Phase I
9 Delivery and Installation of Needle Valve with Float and…

Construction of the Lisna Bori Pipeline Ulcinj

• Construction of ductile pipeline (DCI) with all necessary civil and mechanical works:
-DN250 in length of 1100m;
-Installation of all required fittings and armatures.

 

Investor:  „JKP“ Ulcinj
Total value of project: €184.000





Izgradnja cjevovoda Lisna Bori, Ulcinj
Izgradnja cjevovoda Lisna Bori, Ulcinj
Izgradnja cjevovoda Lisna Bori, Ulcinj
Izgradnja cjevovoda Lisna Bori, Ulcinj
Izgradnja cjevovoda Lisna Bori, Ulcinj
Izgradnja cjevovoda Lisna Bori, Ulcinj
| Web Atelje
 
CMC Group © 2011.