water supply system

Construction of the Pipeline from the Željeznica River to Old Gas Station in Bar

• Construction of the main ductile pipeline (DCI) with all necessary civil and mechanical works:
-DN500 in length of 530m;
-DN200 in length of 20m;
-Installation of all required fittings and armatures.

 

• Construction of the main steel pipeline with all necessary civil and mechanical works:
-Ø500 in length of 18m;

 


Investor: PE „Vodovod i kanalizacija“ Bar, 2008
Total value of project: €323.000