water supply system

Reconstruction of Water Supply Network in the Sveta Vrača Settlement Kotor

• Construction of the pressure pipeline (PEHD PE100 PN10) with all necessary civil and mechanical works:
-Ø200 in length of 200m;
-DN90 PN16 in length of 170m and construction of house connections;
-Installation of all required fittings and armatures.

 


Investor:  PE „Vodovod i kanalizacija" Kotor, 2004-2005
Total value of project: €36.000