water supply system

Construction of House Connections to the Newly Built Water Supply Network in Bar

• Construction of the pipeline (PEHD PE100 PN10) and house connections with all necessary civil and mechanical works:
-Ø63 in length of 1687m,
-Ø90 in length of 85m,
-Ø110 in length of 55m;
-Installation of all required fittings and armatures.

 

• Supply and installation of water meters, set up for remote reading, with all necessary fittings:
- Installed 125 pieces DN40;

 

Investor: PE „Vodovod i kanalizacija“ Bar, 2008
Total value of project: €55.000