• Civil works:
-Construction of control facility;
-Construction of five facilities where pumping units are installed.
• Hydro-mechanical equipment in pumping station:
-Installation of five submersible well pumps ITT Vogel-Austria,
characteristics: Q=40l/s, H=40m.
• Construction and installation of electrical equipment:
-Construction and installation of electrical cabinets with frequency controlers for pump aggregates operation and PLC for process control of pump station;
-Software development for PLC;
-Wiring and connecting of system;
-Construction of transmission line 10kV in length of 750m;
-Construction of power transformer unit 10/04 kV, 630kVA.
• Measuring and regulation equipment in pumping station:
-Flow meter ABB MagMaster DN300 PN10.
-Electronic dry-run protection;
-Electronic continuous water level measurement in wells with a current output signal of 4-20 mA;
-Electronic pressure gauge 0-10 bar, with a current output signal of 4-20 mA.
Investor: Municipality of Nikšić, 2008
Total value of project: €1.600.000