• Delivery and installation of electro-magnetic flow meters and all required fittings, with all necessary civil and mechanical works:
-Water spring „Kajnak“, ABB MagMaster DN400 PN10;
-Water spring „Zaljevo“ , ABB MagMaster DN300 and DN200 PN10;
-Measurement points on the water supply network - ABB MagMaster DN300
and DN350 PN10.
Investor: PE „Vodovod i kanalizacija“ Bar, 2006-2007