• Construction of connections of the existing buildings on the newly constructed sewerage system (PE corrugated pipes), with all necessary civil and mechanical works:
-Ø160 in length of 1040m,
-Ø200 in length of 450m;
-Ø250 in length of 110m;
• Construction of AB inspection chambers, clear opening 1000x1000mm, with concrete gully, installation of ductile iron covers, the capacity of 250 kN, clear opening, diameter 600mm and ductile step irons:
-129 items constructed.
Investor: PE „Vodovod i kanalizacija“ Bar, 2008
Total value of project: €164.000