• Hydro-geological studies of the Kajnak water spring:
-Drilling of five boreholes, Ø200mm, depth: 50m,
-Installation of perforated PVC pipes, for further possible installation of
new pumps.
• The test results showed the NEW quantities of water of 60 l/s;
Investor: PE „Vodovod i kanalizacija“ Bar, 2008
Total value of project: €146.000